Purpose of the rule or reason for the change:
Changes are required to conform with S.B. 21 passed during 2012 General Session (Chapter 360, Laws of Utah 2012).
Summary of the rule or change:
S.B. 21, passed during the 2012 General Session, removed some authorities from the Utah Solid and Hazardous Waste Control Board and its Executive Secretary and gave them to the Director of the Division of Solid and Hazardous Waste. This change in statute now requires changes to the Solid and Hazardous Waste rules. Specifically, references to the "Board" and the "Executive Secretary" in the rules need to be changed to "Director" as appropriate.
State statutory or constitutional authorization for this rule:
- Section 19-6-105
- Section 19-6-108
- Section 19-6-107
Anticipated cost or savings to:
the state budget:
There are no anticipated costs or savings as this amendment only changes who has authority to make regulatory decisions.
local governments:
There are no anticipated costs or savings as this amendment only changes who has authority to make regulatory decisions.
small businesses:
There are no anticipated costs or savings as this amendment only changes who has authority to make regulatory decisions.
persons other than small businesses, businesses, or local governmental entities:
There are no anticipated costs or savings as this amendment only changes who has authority to make regulatory decisions.
Compliance costs for affected persons:
There are no compliance costs for affected persons as this amendment only changes who has authority to make regulatory decisions.
Comments by the department head on the fiscal impact the rule may have on businesses:
There is no anticipated fiscal impact on businesses as this amendment only changes who has authority to make regulatory decisions.
Amanda Smith, Executive Director
The full text of this rule may be inspected, during regular business hours, at the Division of Administrative Rules, or at:
Environmental QualitySolid and Hazardous WasteRoom Second Floor
195 N 1950 W
SALT LAKE CITY, UT 84116-3097
Direct questions regarding this rule to:
- Allan Moore at the above address, by phone at 801-536-0211, by FAX at 801-536-0222, or by Internet E-mail at [email protected]
- Tina Mercer at the above address, by phone at 801-536-0259, by FAX at 801-536-0222, or by Internet E-mail at [email protected]
Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on:
04/01/2013
This rule may become effective on:
04/15/2013
Authorized by:
Scott Anderson, Director
RULE TEXT
R315. Environmental Quality, Solid and Hazardous Waste.
R315-312. Recycling and Composting Facility Standards.
R315-312-2. Recycling and Composting Requirements.
(1) Any recycling or composting facility
shall meet the requirements of Section R315-302-2, and shall submit
a general plan of operation and such other information as requested
by the [Executive Secretary]Director prior to the commencement of any recycling
operation.
(2) Each applicable recycling or
composting facility shall submit a certification that the facility
has, during the past year, operated according to the submitted plan
of operation to the [Executive Secretary]Director by March 1 of each year.
(3) Any facility storing materials in outdoor piles for the purpose of recycling shall be considered to be disposing of solid waste if:
(a) at least 50% of the material on hand
at the beginning of a year at the facility has not been shown to
have been recycled by the end of that year and any material has
been on-site more than two years unless a longer period is approved
by the [Executive Secretary]Director; or
(b) ground water or surface water, air, or land contamination has occurred or is likely to occur under current conditions of storage.
(c) Upon a determination by the [Executive Secretary]Director or his authorized representative that the limits of
Subsection R315-312-2(3)(a) or (b) have been exceeded, the [Executive Secretary]Director may require a permit application and issuance of a
permit as a solid waste disposal facility.
(4) Any recycling or composting facility
may be required to provide financial assurance for clean-up and
closure of the site as determined by the [Executive Secretary]Director.
(5) Tires stored in piles for the purpose of recycling at a tire recycling facility shall be subject to the requirements of Section R315-314-3.
R315-312-3. Composting Requirements.
(1) No new composting facility shall be located in the following areas:
(a) wetlands, watercourses, or floodplains; or
(b) within 500 feet of any permanent residence, school, hospital, institution, office building, restaurant, or church.
(2) Each new compost facility shall meet the requirements of Subsection R315-302-1(2)(f)
(3) Each owner or operator of a composting facility, in addition to the operational plan required in Subsection R315-312-2(1), shall develop, keep on file, and abide by a plan that addresses:
(a) detailed plans and specifications for the entire composting facility including manufacturer's performance data for equipment;
(b) methods of measuring, grinding or shredding, mixing, and proportioning input materials;
(c) a description and location of temperature and other types of monitoring equipment and the frequency of monitoring;
(d) a description of any additive material, including its origin, quantity, quality, and frequency of use;
(e) special precautions or procedures for operation during wind, heavy rain, snow, and freezing conditions;
(f) estimated composting time duration, which is the time period from initiation of the composting process to completion;
(g) for windrow systems, the windrow construction, including width, length, and height;
(h) the method of aeration, including turning frequency or mechanical aeration equipment and aeration capacity; and
(i) a description of the ultimate use for the finished compost, the method for removal from the site, and a plan for the disposal of the finished compost that can not be used in the expected manner due to poor quality or change in market conditions.
(4) Composting Facility Operation Requirements.
(a) Operational records must be maintained during the life of the facility and during the post-closure care period, which include, at a minimum, temperature data and quantity and types of material processed.
(b) All waste materials collected for the purpose of processing must be processed within two years or as provided in the plan of operation.
(c) All materials not destined for processing must be properly disposed.
(d) Turning frequency of the compost must be sufficient to maintain aerobic conditions and to produce a compost product in the desired time frame.
(e) During the composting process, the compost must:
(i) maintain a temperature between 104 and 149 degrees Fahrenheit (40 and 65 degrees Celsius) for a period of not less than five days; and
(ii) reach a temperature of not less than 131 degrees F (55 degrees C) for a consecutive period of not less than four hours during the five day period.
(f) The following wastes may not be accepted for composting:
(i) asbestos waste;
(ii) Hazardous waste;
(iii) waste containing PCBs; or
(iv) treated wood.
(g) Any composting facility utilizing municipal solid waste, municipal sewage treatment sludge, water treatment sludge, or septage shall require the generator to characterize the material and certify that any material used is nonhazardous, contains no PCB's, and contains no treated wood.
(h) If the composting operation will be utilizing domestic sewage sludge, septage, or municipal solid waste:
(i) compost piles or windrows shall be placed upon a surface such as sealed concrete, asphalt, clay, or an artificial liner underlying the pile or windrow, to prevent contamination of subsurface soil, ground water, or both and to allow collection of run-off and leachate. The liner shall be of sufficient thickness and strength to withstand stresses imposed by compost handling vehicles and the compost itself;
(ii) run-off systems shall be designed, installed and maintained to control and collect the run-off from a 25-year storm event;
(iii) the collected leachate shall be
treated in a manner approved by the [Executive Secretary]Director; and
(iv) run-on prevention systems shall be designed, constructed, and maintained to divert the maximum flow from a 25-year storm event.
(i) If the [Executive Secretary]Director determines that a composting operation, which
composts materials other than domestic sewage sludge, septage, or
municipal solid waste, is likely to produce a leachate that in
combination with the hydrologic, geologic, and climatic factors of
the site will present a threat to human health or the environment,
the [Executive Secretary]Director may require the owner or operator of the composting
facility to meet the requirements specified in Subsection
R315-312-3(4)(h).
(j) The finished compost must contain no sharp inorganic objects and must be sufficiently stable that it can be stored or applied to land without creating a nuisance, environmental threat, or a hazard to health.
(5) Composting Facility Closure and Post-closure Requirements.
(a) Within 30 days of closure, a composting facility shall:
(i) remove all piles, windrows, and any other compost material on the composting facility's property;
(ii) remove or revegetate compacted compost material that may be left on the land;
(iii) drain ponds or leachate collection system if any, back-fill, and assure removed contents are properly disposed;
(iv) cover if necessary; and
(v) record with the county recorder as part of the record of title, a plat and statement of fact that the property has been used as a composting facility.
(b) The post-closure care and monitoring shall be for five years and shall consist of:
(i) the maintenance of any monitoring
equipment and sampling and testing schedules as required by the [Executive Secretary]Director; and
(ii) inspection and maintenance of any cover material.
KEY: solid waste management, waste disposal
Date of Enactment or Last Substantive Amendment: [January 13, 2012]2013
Notice of Continuation: February 14, 2008
Authorizing, and Implemented or Interpreted Law: 19-6-105; 19-6-108
Additional Information
The Portable Document Format (PDF) version of the Bulletin is the official version. The PDF version of this issue is available at https://rules.utah.gov/publicat/bull-pdf/2013/b20130301.pdf. The HTML edition of the Bulletin is a convenience copy. Any discrepancy between the PDF version and HTML version is resolved in favor of the PDF version.
Text to be deleted is struck through and surrounded by brackets (e.g., [example]). Text to be added is underlined (e.g., example). Older browsers may not depict some or any of these attributes on the screen or when the document is printed.
For questions regarding the content or application of this rule, please contact Allan Moore at the above address, by phone at 801-536-0211, by FAX at 801-536-0222, or by Internet E-mail at [email protected]; Tina Mercer at the above address, by phone at 801-536-0259, by FAX at 801-536-0222, or by Internet E-mail at [email protected].