DAR File No. 40724

This rule was published in the September 15, 2016, issue (Vol. 2016, No. 18) of the Utah State Bulletin.


Transportation, Preconstruction

Rule R930-7

Utility Accommodation

Notice of Proposed Rule

(Amendment)

DAR File No.: 40724
Filed: 08/31/2016 04:34:42 PM

RULE ANALYSIS

Purpose of the rule or reason for the change:

The purposes of the amendment are: 1) to define how the Department handles requests for longitudinal and site access to highway right-of-way from utility companies that do not directly provide service to the public; 2) provide clarity; and 3) make technical corrections.

Summary of the rule or change:

The amendment defines utility facilities as those directly serving the public. Utility facilities not directly serving the public are defined as private and indirect facilities. Utility facilities may access highway right-of-way under current license and permit requirements. Private and indirect facilities may be allowed longitudinal and site access (e.g. towers, poles, pads) to highway right-of-way by lease.

Statutory or constitutional authorization for this rule:

  • Subsection 72-6-116(2)

Anticipated cost or savings to:

the state budget:

The Department does not anticipate this amendment will lead to any additional costs or savings to the state's budget. The amendment accommodates how different kinds of private utility facilities may access state-owned rights-of-way and should not have any impact on the state's budget.

local governments:

The Department does not anticipate this amendment will lead to any additional costs or savings to the budgets of local governments. The amendment accommodates how different kinds of private utility facilities may access state-owned rights-of-way and should not have any impact on the budgets of local governments.

small businesses:

This amendment may have a fiscal impact on private small businesses that operate utility facilities. The amount of the fiscal impact this amendment will have on these small businesses will be negotiated and depend on conditions related to the access request and the type of utility facility involved and cannot be predetermined.

persons other than small businesses, businesses, or local governmental entities:

This amendment may have a fiscal impact on persons other than small businesses, businesses, or local government entities if they operate utility facilities. The amount of the fiscal impact this amendment will have on these persons other than small businesses, businesses, or local government entities will be negotiated and depend on conditions related to the access request and the type of utility facility involved and cannot be predetermined.

Compliance costs for affected persons:

The amendment affects private and indirect utility facilities that may request longitudinal and site access to highway rights-of-way in the future. Companies installing private and indirect utility facilities have an option to negotiate a lease arrangement with the Department within highway right-of-way. Compliance costs for companies seeking to install private and indirect utility facilities are to be negotiated and will depend on conditions related to the access request and the type of utility facility, which cannot be predetermined.

Comments by the department head on the fiscal impact the rule may have on businesses:

This amendment will not have a direct fiscal impact on businesses generally. There will be a fiscal impact for those businesses seeking to install private and indirect utility facilities on Department rights-of-way. Those impacts will be negotiated, and the impact will depend upon conditions related to the access request and the type of utility facility.

Carlos Braceras, Executive Director

The full text of this rule may be inspected, during regular business hours, at the Office of Administrative Rules, or at:

Transportation
Preconstruction
CALVIN L RAMPTON COMPLEX
4501 S 2700 W
SALT LAKE CITY, UT 84119-5998

Direct questions regarding this rule to:

  • Christine Newman at the above address, by phone at 801-965-4026, by FAX at 801-965-4338, or by Internet E-mail at cwnewman@utah.gov
  • James Palmer at the above address, by phone at 801-965-4000, by FAX at 801-965-4338, or by Internet E-mail at jimpalmer@utah.gov
  • Michelle Jeronimo at the above address, by phone at 801-965-3883, by FAX at , or by Internet E-mail at mjeronimo@utah.gov
  • Linda Hull at the above address, by phone at 801-965-4253, by FAX at , or by Internet E-mail at lhull@utah.gov

Interested persons may present their views on this rule by submitting written comments to the address above no later than 5:00 p.m. on:

10/17/2016

This rule may become effective on:

10/24/2016

Authorized by:

Carlos Braceras, Executive Director

RULE TEXT

R930. Transportation, Preconstruction.

R930-7. Utility Accommodation.

R930-7-1. Purpose.

(1) The purpose of this rule is to:

(a) maximize public safety;

(b) provide for efficient highway operations and maintenance of roadways:

(c) maximize aesthetic quality;

(d) minimize future conflicts between the highway system and utility companies serving the general public; and

(e) ensure that use and occupancy by utility companies do not impair or increase the cost of future highway construction, expansion, or maintenance or interfere with any right of way reserved for these purposes.

(2) This rule prescribes conditions under which utility facilities may be accommodated on right of way and sets forth the state's regulations covering the placement and relocation of utility facilities in conflict with the construction and maintenance of highways. General installation requirements, general and definitive design requirements, and utility construction and inspection requirements apply to indirect and private facilities within the right of way. Within UDOT's sole discretion, indirect and private facilities may be allowed on UDOT's right-of-way by lease.

(3) This rule should be interpreted to achieve maximum lawful public use of right of way for transportation purposes and to ensure that utility installations and operations affecting state right of way are accomplished in accordance with state and federal laws and regulations. It is in the public interest for utility facilities to be accommodated within rights of way when the accommodation does not adversely affect the integrity of highway features or occupy space within the right-of-way that conflicts with transportation purposes or future use of the highway. The permitted use and occupancy of right of way for non-highway purposes is subordinate to the primary and highest interest[s] for transportation and safety of the traveling public. Utility facilities may be required to relocate outside of the right of way to accommodate UDOT's projects.

(4) This rule is provided to facilitate the establishment of consistent expectations and effective working relationships between UDOT and utility companies through continuous communication, coordination and, cooperation.

(5) Through the Code of Federal Regulations (23 CFR, Part 645.215(a)), the U.S. Department of Transportation requires each state to submit a statement to the Federal Highway Administration (FHWA) on the authority of utility companies to use and occupy the right of way of state highways, the state highway agency's power to regulate the use, and the policies the state employs or proposes to employ for accommodating utilities within the right of way of Federal-aid highways under its jurisdiction. This rule demonstrates compliance to FHWA.

 

R930-7-3. Definitions.

(1) "Abandoned facility" is a utility facility that is not in use, no longer actively providing a service and is physically disconnected from the operating facility that is still in use and still actively providing a service. Abandoned facilities remain the property of the utility company.

(2) "Access control" is the regulation of public access to and from properties abutting the highway facilities. The two basic types of access control are:

(a) "No access (NA)" means access to through-traffic lanes is not allowed except at interchanges. Crossings at grade and direct driveway connections are prohibited.

(b) "Limited access (LA)" means access to selected public roads may be provided. There may be some crossings at grade and some private driveway connections.

(3) "Administrative citation" is a letter from UDOT to a utility company citing one or more non-compliance items and proper redress requirements such as action on the appropriate bond, revocation of permit, and revocation of a license agreement.

(4) "AASHTO" is the American Association of State Highway and Transportation Officials.

(5) "Backfill" means the replacement of soil removed during construction. It may also denote material placed over or around structures and utilities.

(6) "Bedding" means the composition and shaping of soil or other suitable material to support a pipe, conduit, casing, or utility tunnel.

(7) "Boring" means the operation by which carriers or casings are pushed or jacked under highways without disturbing the highway structure or prism. Bores are carved progressively ahead of the leading edge of the advancing pipe as soil is mucked back through the pipe.

(8) "Carrier" means a pipe directly enclosing a transmitted fluid (liquid, gas, or slurry).

(9) "Casing" is a larger pipe, conduit, or duct enclosing a carrier.

(10) "Clear Zone" means the total roadside border area, starting at the edge of the traveled way, available for safe use by errant vehicles. This area may consist of a shoulder, a recoverable slope, a non-recoverable slope, and a clear run-out area. The desired width is dependent upon traffic volumes, speeds, and roadside geometry.

(11) "Coating" is material applied to or wrapped around a pipe.

(12) "Conduit" is an enclosed tubular casing for the protection of wires and cables.

(13) "Depth of bury (cover)" means the depth from ground or roadway surface to top of pipe, conduit, casing, cable, utility tunnel, or similar facility.

(14) "Deviation" means a granted permission to depart from the standards and requirements of this rule.

(15) "Emergency work" is utility company work required to prevent loss of life or significant damage to property.

(16) "Encasement" is a structural element surrounding a carrier or casing.

(17) "Encroachment" means the unauthorized use of highway right of way.

(18) "Encroachment permit" is a document that specifies the requirements and conditions for performing work on the highway right of way.

(19) "Environmentally protected areas" are areas that include, but are not limited to, wetlands, flood plains, stream channels, rivers, threatened or endangered species, archaeological sites, and historic sites.

(20) "Expressway" is a divided arterial highway for through traffic with partial control of access and generally with grade separations at major intersections.

(21) "Federal-aid highways" are highways eligible to receive Federal-aid.

(22) "FHWA" is the Federal Highway Administration.

(23) "Flexible carrier pipe" is a plastic, fiberglass, or metallic pipe having a large diameter to wall thickness ratio and which can be deformed without undue stress.

(24) "Flowable fill" is low strength flowable concrete as defined in UDOT Standard Specification 03575.

(25) "Freeway" is an expressway with full control of access.

(26) "Frontage road" is a local street or road auxiliary to and located on the side of an arterial highway for service to abutting property and adjacent areas and for control of access.

(27) "Grade" is the rate or percent of change in slope, either ascending or descending, measured along the centerline of a roadway or access.

(28) "Grounded" means electrically connected to earth or to some extended conducting body that serves instead of the earth, whether the connection is intentional or accidental.

(29) "Grout" is a cement mortar or slurry of fine sand or clay.

(30) "Highway, street, or road" are general terms denoting a public way for the transportation of people, materials, and goods, but primarily for vehicular travel, including the entire area within the right of way.

(31) "Horizontal directional drilling" (HDD), also known as directional boring and directional drilling, is a method of installing underground pipes and conduits from the surface along a prescribed bore path. The process is used for installing telecommunications and power cable conduits, water lines, sewer lines, gas lines, oil lines, product pipelines, and casings used for environmental remediation. It is used for crossing waterways, roadways, congested areas, environmentally protected areas, and any area where other methods are not feasible.

(32) "Indirect facilities" are facilities owned by a utility company or entity that does not directly serve the public and the facilities provide services to or are rented to other utility companies.

(3[2]3) "Interstate highway system" (Interstate) is the Dwight D. Eisenhower National System of Interstate and Defense Highways as defined in the Federal-aid Highway Act of 1956 and any supplemental acts or amendments.

(3[3]4) "License Agreement or Statewide Utility License Agreement" is a document by which UDOT licenses the use and occupancy, with conditions, of highway rights of way for utility facilities.

(3[4]5) "Manhole" or "utility access hole" is an opening in an underground system that workers or others may enter for the purpose of making installations, removals, inspections, repairs, connections, and tests.

(3[5]6) "Median" is the portion of a divided highway separating the traveled ways for traffic in opposite directions.

(3[6]7) "MUTCD (Utah MUTCD)" means the current version of Utah Manual on Uniform Traffic Control Devices referenced in R920-1.

(3[7]8) "Pavement structure" is the combination of sub-base, base course, and surface course placed on a sub-grade to support the traffic load.

(3[8]9) "Permit" means encroachment permit.

([39]40) "Pipe" is a tubular product made as a production item for the transmission of liquid or gaseous substances. Cylinders formed from plate material in the fabrication of auxiliary equipment are not pipe as defined here.

(4[0]1) "Pipeline" is a continuous carrier used primarily for the transportation of liquids, gases, or solids from one point to another using either gravity or pressure flow.

(4[1]2) "Plowing" means the direct burial of utility lines by means of a mechanism that breaks the ground, places the utility line, and closes the break in the ground in a single operation.

(4[2]3) "Practicable" means reasonably capable of being accomplished or feasible as determined by UDOT.

(4[3]4) "Relocate" means the adjustment of utility facilities when found by UDOT to be necessary for construction or maintenance of a highway. It includes removing and reinstalling the facility, including necessary temporary facilities, acquiring the necessary right-of-way on the new location, moving, rearranging or changing the type of existing facilities and taking any necessary safety and protective measures. It also means constructing a replacement facility that is both functionally equivalent to the existing facility and necessary for continuous operation of the utility service, the project economy, or sequence of highway construction.

(4[4]5) "Right of way" is a general term denoting land, property, or interest therein, usually in a strip acquired for or devoted to transportation purposes.

(4[5]6) "Roadside" is a general term denoting the area between the outer edge of the roadway shoulder and the right of way limits.

(4[6]7) "Roadway" is the portion of a highway, including shoulders, for vehicular use. A divided highway has two or more roadways.

(4[7]8) "Slope" is the relative steepness of the terrain expressed as a ratio or percentage. Slopes may be categorized as positive or negative and as parallel or cross slopes in relation to the direction of traffic.

(4[8]9) "State highways" are those highways designated as State Highways in Title 72, Chapter 4, Designation of State Highways.

([49]50) "Structure" means any device used to convey vehicles, pedestrians, animals, waterways or other materials over highways, streams, canyons, or other obstacles. It also includes buildings, signs, and UDOT facilities with foundations.

(5[0]1) "Subsurface Utility Engineering (SUE)" is the management of certain risks associated with utility mapping at appropriate quality levels, utility coordination, utility relocation, communication of utility data, utility relocation cost estimates, implementation of utility accommodation policies, and utility design. SUE tools include traditional records, site surveys, and new technologies such as surface geophysical methods and non-destructive vacuum excavation, to provide quality levels of information. The SUE process for collecting and depicting information on existing subsurface Utility Facilities is described in ASCE Standard 38-02, Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data.

(5[1]2) "Trenched" means installed in a narrow open excavation.

(5[2]3) "Trenchless (Untrenched)" means installed without breaking the ground or pavement surface by a construction method such as directional drilling, boring, tunneling, jacking, or auguring.

(5[3]4) "UDOT" is the Utah Department of Transportation and where referenced to be contacted, submitted to, approved by, accepted by or otherwise engaged, means an authorized representative.

(5[4]5) "Utility" or "utility facility" means privately, publicly, cooperatively, or municipally owned pipelines, facilities, or systems for producing, transmitting, or distributing communications, power, electricity, light, heat, gas, oil, petroleum products, cable television, water, sewer, steam, waste, storm water not connected with highway drainage, and other similar commodities, which directly [or indirectly ]service the public[, or any part thereof].

(5[5]6) "Utility appurtenances" include but are not limited to pedestals, manholes, vents, drains, rigid markers, meter pits, sprinkler pits, valve pits, and regulator pits.

(5[6]7) "Utility company" is a privately, cooperatively, or publicly owned utility, including utilities owned by political subdivisions, and where referenced includes authorized representatives, contractors, and agents.

(5[7]8) "Vent" is an appurtenance designed to discharge gaseous contaminants from a casing.

 

R930-7-6. General Installation Requirements.

(1) General.

(a) Utility companies with facilities directly serving the public desiring to use right of way under the jurisdiction of UDOT for the installation or maintenance of any utility facility must be licensed to do so by entering into a Statewide Utility L[l]icense A[a]greement with UDOT. This [statewide ]License A[a]greement sets forth the procedures and conditions for the issuance of encroachment permits for all installations statewide. Encroachment permits are not issued without a L[l]icense A[a]greement first being executed. UDOT may impose additional restrictions or requirements for L[l]icense A[a]greements or encroachment permits.

(b) A permitted facility shall, if necessary, be modified by the utility company to improve safety or facilitate alteration or maintenance of the right of way as determined by UDOT.

(c) Companies or entities that do not provide direct utility service to the public are prohibited from installing or constructing longitudinal facilities or site towers or poles within the right-of-way by permit. UDOT will not issue any permits for this type of facilities.

(2) License Agreements or Statewide Utility License Agreements.

(a) Agreements are executed by UDOT and utility companies to set forth the terms and conditions for the accommodation and maintenance of utility facilities within the right of way. A L[l]icense A[a]greement is required for, but does not guarantee the approval of encroachment permits.

(b) As part of executing a L[l]icense A[a]greement with UDOT, owners of facilities located in the right of way are required to post a continuous bond in the amount of $100,000, naming UDOT as the insured, to guarantee satisfactory performance. The Statewide Utilities Engineer may approve a lesser amount.[Failure by a utility company to maintain a valid bond in the amount required is cause for denying issuance of future permits to that utility company, and for the removal of that utility company's facilities from the right of way.]

(c) A public utility is exempt from the bond requirements described in this section if the public utility:

(i) is a member of the municipal insurance pool;

(ii) is a political subdivision; or

(iii) at UDOT's option carries liability insurance with minimum coverage of $1,000,000 per occurrence and as more specifically described in its License Agreement.

(d) Upon discovery of utility caused damage to the highway or to the right of way, UDOT may opt to exercise its bonding rights in recovering costs incurred to restore the highway or right of way. The utility company is liable for all restoration costs incurred as a result of damages caused by its utility, and its liability is not limited to the amount of the bond.

(e) License agreements may be terminated at any time by either party upon 30 days advance written notice to the other. Permits previously issued and approved under a terminated agreement are not affected and remain in effect on the same terms and conditions set forth in the agreement and permits. The obligation to maintain the $100,000 bond continues until the utility company's facilities are removed from UDOT's right of way.

(3) Emergency Work.

(a) In all emergency work situations, the utility company or its representative shall contact UDOT immediately and on the first business day shall contact UDOT to complete a formal permit. Failure to contact UDOT for an emergency work situation and obtain an encroachment permit within the stated time period is considered to be a violation of the terms and conditions of the utility company's license agreement. At the discretion of the utility company, emergency work may be performed by a bonded contractor, public agency, or a utility company. None of the provisions of this rule are waived for emergency work except for the requirement of a prior permit.

(4) One Call Requirements.

(a) Underground facilities are not permitted within the right of way unless the utility company subscribes to Blue Stakes of Utah and other appropriate "call-before-you-dig" systems, or otherwise provides utility plans as detailed in Section R930-7-11(6)(a) of this rule.

(5) Preservation of New Pavement.

(a) Cuts or open excavations on newly constructed, paved, or overlaid highways are not allowed for two years. If an emergency cut or excavation occurs, the responsible utility company shall comply with any special conditions imposed by UDOT regarding restoration of the roadway.

(6) Encroachment Permits.

(a) Encroachment Permits on State Highways.

Utility companies shall obtain an encroachment permit from UDOT for the installation and maintenance of utility facilities on the right of way. Encroachment permits are approved or disapproved by UDOT. Applications for encroachment permits are submitted to the Region Permits Officers by the utility company or its contractor. No utility company or utility company contractor shall begin any utility work on the right of way until an approved encroachment permit is issued by UDOT and the utility company is authorized to proceed in writing. Prior to the issuance of encroachment permits, fees are assessed to cover related costs incurred by UDOT including costs for planning, coordination, and utility plan review.

If the utility company expects work to significantly impact travel lane capacity, UDOT recommends the utility company contact the appropriate Region Permit Office to discuss concepts in advance of submitting an encroachment permit application.

Utility companies shall submit two sets of plans depicting the proposed installation. The plans shall be sized as required by UDOT and include utility company identification, work location, utility type and size, type of construction, vertical and horizontal location of facilities relative to the centerline of road, location of all appurtenances, trench details, right of way limits, and traffic control plans. Traffic control plans shall conform to the Utah MUTCD as outlined in Section R930-7-7(1)(d), are mandatory for each instance of utility construction or maintenance, and shall be attached to each permit application.

Utility companies may authorize their contractors to obtain permits on their behalf. All terms and conditions set forth in the L[l]icense A[a]greement apply. The utility company's construction forces or the utility contractor shall carry a copy of the approved permit at all times while working on the right of way.

(b) Bonding and Liability Insurance Requirements.

(i) Individual (one-time use) Encroachment Permit Bonding Requirements. As authorized by Sub-section 72-7-102(3)(b)(i) this rule requires encroachment permit applicants to post a Performance and Warranty Bond, using UDOT's approved bond form, for a period of three years from the date of beginning of work or two years from the end of work, whichever provides the longer period of coverage. A separate Performance and Warranty Bond is required for each individual encroachment permit. Political subdivisions of the state are not required to post a bond unless the political subdivision fails to meet the terms and conditions of previous permits issued as determined by UDOT. The amount of the bond is determined by the UDOT Region Permits Officer based on the scope of work being performed but will not be less than $10,000.

(ii) Statewide (multiple use) Encroachment Permit Bonding Option. In lieu of posting multiple individual one-time use bonds, encroachment permit applicants who routinely acquire encroachment permits may elect to post a statewide performance and warranty bond, using UDOT's approved bond form. A statewide bond satisfies bonding requirements for work in all UDOT Regions. The bond amount is determined by UDOT but will not be less than $100,000. [A valid statewide bond period shall be not less than three years from the date of completion of permitted work.]This bond is in addition to the bond for the License Agreement.

(iii) Inspection Bond. UDOT may require an additional inspection bond to ensure payment for UDOT field review and inspection costs before an encroachment permit is granted.

(iv) Proceeds Against the Bond. UDOT may proceed against the bond to recover all expenses incurred if payment is not received from the permit applicant within 45 calendar days of receiving an invoice. Upon discovery of utility caused damage to the highway or to the right of way, UDOT may opt to exercise its bonding rights in recovering costs incurred to restore the highway or right of way due to utility caused damages. Failure by the utility company to maintain a valid bond in the amounts required shall be cause for denying issuance of future permits and for the removal of the utility from the right of way.

(v) Liability Insurance Requirements. Permit applicants are also required to provide a certificate of liability insurance in the minimum amounts of $1,000,000 per occurrence and $2,000,000 in aggregate. Failure to meet this requirement will result in application denial. Liability insurance coverage is required throughout the life of the permit and cancellation will result in permit revocation.

(vi) Information about bond forms and liability insurance requirements are available on UDOT's website at: http://www.udot.utah.gov/go/encroachmentpermit

[(c) Cancellation of Permits. Any failure on the part of a utility company to comply with the terms and conditions set forth in the license agreement or the encroachment permit may result in cancellation of the permit. Failure to pay any sum of money for costs incurred by UDOT in association with installation or construction review, inspection, reconstruction, repair, or maintenance of the utility facilities may also result in cancellation of the permit. UDOT also may remove the facilities and restore the highway and right of way at the sole expense of the utility company. Prior to any cancellation, UDOT shall notify the utility company in writing, setting forth the violations, and will provide the utility company a reasonable time to correct the violations to the satisfaction of UDOT.]

([d]c) Assignment of Permits. Permits shall not be assigned without the prior written consent of UDOT. All assignees shall be required to [file a new permit application]execute a License Agreement.

([e]d) Indemnification. Permit holders performing utility work on the right of way shall, at all times, indemnify and hold harmless UDOT, its employees, and the State of Utah from responsibility for any damage or liability arising from their construction, maintenance, repair, or any other related operation during the work or as a result of the work. Permit holders shall also be responsible for the completion, restoration, and maintenance of any excavation for a period of three years unless UDOT requires a longer period of indemnification due to specific or unique circumstances.

(e) Cancellation of Permits and Termination of License Agreement. The following situations will cause the cancellation of permits and/or termination of the License Agreement:

(i) A utility company's failure to maintain a valid bond in the amount required;

(ii) A utility company's failure to comply with the terms and conditions of the License Agreement;

(iii) A utility company's failure to comply with the requirements of the encroachment permit; and

(iv) A utility company's failure to pay any sum of money for costs incurred by UDOT in association with installation or construction review, inspection, reconstruction, repair, or maintenance of the utility facilities.

When the permit is canceled, UDOT also may remove the facilities and restore the highway and right of way at the sole expense of the utility company. Prior to any cancellation, UDOT shall notify the utility company in writing, setting forth the violations, and will provide the utility company a reasonable time to correct the violations to the satisfaction of UDOT. UDOT may also not issue any further permits to utility companies that do not comply with this rule, permit requirements, or the License Agreement.

 

R930-7-10. Utilities within Interstate, Freeway and Access Controlled Right-of-Way.

(1) General Provisions. There are two basic types of access control.

No Access - does not allow access to the through-traffic lanes except at interchanges. Crossings at grade and direct driveway connections are prohibited. Access is controlled by fencing. This is typical of interstates and freeways.

Limited Access - provides access to selected roads. There may be some crossings at grade and some private driveway connections. This is typical of expressways and certain other highways.

(2) Factors UDOT may consider for allowing accommodation include distance between distribution points, terrain, cost, and prior existence.

(3) Longitudinal telecommunication installations may be allowed under Rule R907-64.

(4) Pursuant to FHWA regulations, UDOT may allow longitudinal accommodation of utility facilities but with greater restrictions within no access and limited access highway right of way as follows:

(a) No access: longitudinal installations on highways with no access are not permitted except in cases where no other feasible location exists and under strictly controlled circumstances. FHWA approval is required for installations on interstate facilities. Longitudinal telecommunication facilities are allowed pursuant to Utah Code Section 72-7-108; and

(b) Limited Access: longitudinal installations on highways with limited access are generally not permitted.[When such installations are allowed, individual service connections are not permitted unless no other reasonable alternatives exist.]

(5) Utility facilities are allowed to cross no access and limited access highway right-of-way but with additional requirements as noted below in Section R930-7-10(7).

(6) Longitudinal Utility Facilities.

(a) In addition to the requirements in Section R930-7-8(1)(a), the following requirements apply.

(i) Service connections are not permitted within no access highway right of way. Service connections are not permitted within limited access highway right of way unless no reasonable alternative exists as demonstrated by the utility company and as reviewed and approved by UDOT.

(ii) Service, maintenance, and operation of utilities installed along and within no access highway right of way may not be conducted from the through-traffic roadways or ramps. All maintenance activities must be accessed from a point approved by UDOT and FHWA.

(iii) An existing utility facility within the right of way acquired for an interstate, freeway, or access controlled highway project may remain if it can be serviced, maintained, and operated without access from the through-traffic roadways or ramps, and it does not adversely affect the safety, design, construction, operation, maintenance, or stability of the interstate, freeway, or access controlled highway. Otherwise, it shall be relocated.

(iv) Where approval for installation is permitted, utility installations and related components shall be buried parallel to the interstate, freeway, or access controlled highway and shall be located within five feet of the outer most right of way limits. Utility appurtenances shall be located as close as possible to the right of way line.

(v) An existing utility carried on an interstate, freeway, or access controlled highway structure crossing a major valley or river may be permitted by UDOT to continue to be carried at the time the route is improved if the utility facility is serviced without interference to the traveling public.

(7) Utility Crossings.

(a) In addition to the requirements in Section R930-7-8(1)(d), the following requirements apply.

(i) A utility following a crossroad or street which is carried over or under an interstate, freeway, or access controlled highway must cross the interstate, freeway, or access controlled highway at the location of the crossroad or street in such a manner that the utility can be serviced without access from the through-traffic roadways or ramps.

(ii) Overhead utility lines crossing an interstate, freeway, or access controlled highway shall be adjusted so that supporting structures are located outside access control lines. In no case shall the supporting poles be placed within the clear zone. Where required for support, intermediate supporting poles may be placed in medians of sufficient width that provide the clear zone from the edges of both travelled ways. If additional lanes are planned, the clear zone shall be determined from the ultimate edges of the travelled way. When right of way lines and access control lines are not the same, such as when frontage roads are provided, supporting poles may be located in the area between them.

(iii) At interchange areas, supports for overhead utility facilities will be permitted only if located beyond the clear zone of traffic lanes or ramps, sight distance is not impaired, and can be safely accessed.

(iv) Manholes and other points of access to underground utilities may be permitted within the right of way of an interstate, freeway, or access controlled highway if they can be serviced or maintained without access from the through-traffic roadways or ramps. When right of way lines and access control lines are not the same, such as when frontage roads are provided, manholes and other points of access may be located in the area between them.

(v) Where a casing is not otherwise required, it shall be considered as expedient in the insertion, removal, replacement, or maintenance of carrier pipes crossing interstate, freeways, or access controlled highways. Casings shall extend to the access control lines. See Section R930-7-8(4).

(8) Longitudinal Telecommunications Installation.

(a) Installation must comply with R907-64.

(9) Wireless Telecommunications Facilities.

(a) Facilities must comply with R907-64.

 

R930-7-13. Deviations.

(1) Deviations from provisions of this rule may be allowed if they do not violate state and federal statutes, law, or regulations and UDOT has determined the use of the right of way will be for the public good without compromising the transportation purposes of the right of way.

(2) Requests for deviations with limited impact may be considered by UDOT on an individual basis, upon justification submitted by the utility company. UDOT will not consider cost to the utility company as the primary deciding factor in granting a deviation.

(3) Requests for significant deviations must demonstrate extreme hardship and unusual conditions and provide justification for the deviation. Requests must demonstrate that alternative measures can be specified and implemented and still fulfill the intent of state and federal statute and regulations. Requests for these deviations must include the following:

(a) formal request by the utility company; and

(b) an evaluation of the direct and indirect design, safety, environmental, and economic impacts associated with granting a deviation.

(4) In order for UDOT to grant a significant deviation the following approvals are necessary:

(a) formal recommendation for approval by the UDOT Region Permits Officer or the officer's supervisor;

(b) formal recommendation for approval from the UDOT Region Director;

(c) concurrence of the UDOT Statewide Utilities Engineer; and

(d) FHWA concurrence if the deviation applies to a utility facility located within a Federal-aid highway right of way.

(5) For UDOT projects that are solely state funded, UDOT may deviate from the utility relocation regulations contained in the Code of Federal Regulations by reimbursing a utility company for replacement of existing buildings with functionally equivalent buildings, if the following requirements are met:

(a) the utility company owns the property in fee that UDOT needs to acquire for its project;

(b) the utility company owns operational facilities located upon, below or above the property;

(c) the utility company owns a building on the property that provides maintenance services for the utility facility;

(d) a property purchase in accordance with 49 CFR 24 will not adequately compensate the utility company's costs to relocate and functionally re-establish the maintenance facility; and

(e) the deviation promotes the public interest.

 

R930-7-14. Enforcement.

(1) This rule is subject to enforcement pursuant to and as provided for in Utah Code, and may include, but not be limited to the following:

(a) administrative citations, in letter form, citing non-compliance items and proper redress requirements, including notice that UDOT may take whatever action is necessary to rectify the situation and subsequently submit a claim against the appropriate bond to recover from the utility company actual costs incurred by UDOT;

(b) increased bonding levels to recoup potential restoration costs on current or future utility projects;

(c) denial of future permits until past non-compliance is resolved;

(d) termination of the License Agreement; and

([d]e) legal action to secure reimbursement from the utility company for costs incurred by UDOT due to damages to the right of way or noncompliance with the permit, rule or License Agreement.

 

KEY: right-of-way, utilities, utility accommodation

Date of Enactment or Last Substantive Amendment: [ February 23, ]2016

Authorizing, and Implemented or Interpreted Law: 72-6-116(2)


Additional Information

More information about a Notice of Proposed Rule is available online.

The Portable Document Format (PDF) version of the Bulletin is the official version. The PDF version of this issue is available at https://rules.utah.gov/publicat/bull-pdf/2016/b20160915.pdf. The HTML edition of the Bulletin is a convenience copy. Any discrepancy between the PDF version and HTML version is resolved in favor of the PDF version.

Text to be deleted is struck through and surrounded by brackets ([example]). Text to be added is underlined (example).  Older browsers may not depict some or any of these attributes on the screen or when the document is printed.

For questions regarding the content or application of this rule, please contact Christine Newman at the above address, by phone at 801-965-4026, by FAX at 801-965-4338, or by Internet E-mail at cwnewman@utah.gov; James Palmer at the above address, by phone at 801-965-4000, by FAX at 801-965-4338, or by Internet E-mail at jimpalmer@utah.gov; Michelle Jeronimo at the above address, by phone at 801-965-3883, by FAX at , or by Internet E-mail at mjeronimo@utah.gov; Linda Hull at the above address, by phone at 801-965-4253, by FAX at , or by Internet E-mail at lhull@utah.gov.  For questions about the rulemaking process, please contact the Office of Administrative Rules.